Multi-storey and high-rise opportunities
High-rise formwork is a target area for the business. Every opportunity must be matched to the project’s technical requirements and the resources available for that contract. Completed project experience will be shown separately, when supported by verified records.
Typical information for review
A formwork enquiry may cover foundations, walls, columns, beams, suspended slabs or stair structures, subject to the tender scope. Share the structural drawings, formwork specification, pour sequence, site access information, programme and package boundaries.
Tender discussion
A useful first discussion confirms the required system, design responsibilities, lifting and access assumptions, inspection points, concrete sequence, interfaces with other trades and required handover records. Scope and capacity are confirmed before any delivery claim is made.