Quality, safety and delivery start with the scope.
Each project has its own drawings, interfaces, programme and site rules. Ebenshow Carpentry reviews those requirements before agreeing the work package and the records needed at handover.
- 01
Confirm the package
Agree the drawing revisions, specification, inclusions, exclusions, interfaces and approval responsibilities.
- 02
Plan the sequence
Review access, work areas, trade coordination, programme, materials and project-specific start requirements.
- 03
Agree checks and records
Identify inspections, hold points, approvals, change records and quality documentation required by the contract.
- 04
Work to site requirements
Confirm inductions, risk controls, permits, personal protective equipment and emergency arrangements with the site team.
- 05
Close out the work
Resolve agreed defects and submit the records and handover items required for the work package.
Tell us what the contract requires.
Include project-specific quality, safety, environmental, inspection, reporting and handover requirements with tender documents. Deliverables and responsibilities are confirmed for the contract.
Certification or management-system information is included only when current, verified and relevant to the project.
Have a project or tender to discuss?
Share the scope and programme. We will confirm what information is needed for review.